Showing posts with label HMS Bounty. Show all posts
Showing posts with label HMS Bounty. Show all posts

Saturday, February 16, 2019

"HMS Bounty" The Maine Windjammer Project


"HMS Bounty" by Doug Mills
The HMS Bounty has been gone now for many years, but for those who 
got to know her she is sorely missed.


LIKE WHAT YOU SEE...
Think how nice this would look hanging in your living room.
Purchase my framed prints at



Photos provided by Maine Windjammer Project
The Maine Windjammer Project started in 2007 to preserve the modern history of the Maine Windjammer and to make it available to the generations to come.
This historical archive is available to museums and for historical research.
For more info contact: dougmills@shootmainestudios.com


WATCH MAINE POSITIVE TV

Friday, February 15, 2019

"The Last Haul Out" The maine Windjammer Project


"The Last Haul Out" by Doug Mills
The last haul out for the HMS Bounty only just over a week before she sunk.


LIKE WHAT YOU SEE...
Think how nice this would look hanging in your living room.
Purchase my framed prints at



Photos provided by Maine Windjammer Project
The Maine Windjammer Project started in 2007 to preserve the modern history of the Maine Windjammer and to make it available to the generations to come.
This historical archive is available to museums and for historical research.
For more info contact: dougmills@shootmainestudios.com


WATCH MAINE POSITIVE TV

Saturday, December 1, 2018

"Tall Ship HMS Bounty" The Maine Windjammer Project


"Tall Ship HMS Bounty" by Doug Mills
Tall ship HMS Bounty at the dock in Boothbay Harbor Maine.


LIKE WHAT YOU SEE...
Think how nice this would look hanging in your living room.
Purchase my framed prints at



Photos provided by Maine Windjammer Project
The Maine Windjammer Project started in 2007 to preserve the modern history of the Maine Windjammer and to make it available to the generations to come.
This historical archive is available to museums and for historical research.
For more info contact: dougmills@shootmainestudios.com


WATCH MAINE POSITIVE TV

Monday, February 26, 2018

"HMS Bounty" The Maine Windjammer Project


"HMS Bounty" by Doug Mills
The HMS Bounty before her last haulout in Boothbay Harbor Maine.



Photos provided by Maine Windjammer Project
The Maine Windjammer Project started in 2007 to preserve the modern history of the Maine Windjammer and to make it available to the generations to come.
This historical archive is available to museums and for historical research.
For more info contact: dougmills@shootmainestudios.com


WATCH MAINE POSITIVE TV

Friday, June 30, 2017

"The Last Haulout" The Maine Windjammer Project


"The Last Haulout" by Doug Mills
The last haulout for HMS Bounty in Boothbay Harbor, Maine.


These photos are from the historical archives of the Maine Windjammer Project.
The Maine Windjammer Project started in 2007 to preserve the modern history of the Maine Windjammer and to make it available to the generations to come.
This historical archive is available to museums and for historical research.
For more info contact: dougmills@shootmainestudios.com



Friday, December 23, 2016

"HMS Bounty" The Maine Windjammer Project


"HMS Bounty" by Doug Mills
Hauling the HMS Bounty in Boothbay Harbor, Maine.




Now you can own the photos you see on RCN America Network and Rocky Coast News!
Visit our online gallery: www.rcnamericanetwork.zenfolio.com

PHOTOS
PHOTO BOOKS
POSTERS
GALLERY WRAP WALL PRINTS

Saturday, August 13, 2016

"HMS Bounty" The Maine Windjammer Project


"HMS Bounty" by Doug Mills
The HMS Bounty's last haul out at Boothbay Harbor Maine.





With over 40 years in the arts he brings a wealth of artistic expression to his new designer fashions.  Doug's photos will transport you to a place where life is simple and the unspoiled beauty will take your breath away.

Tuesday, December 15, 2015

"And all I ask is a tall ship and a star to steer her by" The Maine Windjammer Project

"And all I ask is a tall ship and a star to steer her by" Photo by Doug Mills
"And all I ask is a tall ship and a star to steer her by,
And the wheel's kick and the wind's song and the white sail's shaking,
And a grey mist on the sea's face and a grey dawn breaking."
Salt-Water Ballads – Masefield





Thursday, January 29, 2015

"In Boothbay Harbor" The Maine Windjammer Project

"In Boothbay Harbor" by Doug Mills
The HMS Bounty in Boothbay Harbor. [10172012]




EXCLUSIVE OFFER: Doug Mills newest documentary "Windjammer" on DVD plus "The Great American Windjammer Vol.1" 
200 pages with nearly 100 8x10 photos.
ONLY: $40.00 for the package!

Tuesday, January 20, 2015

"HMS Bounty" The Maine Windjammer Project

"HMS Bounty" by Doug Mills
The HMS Bounty hauled out at Boothbay Harbor Maine. [09172021]



Trailer for Doug Mills new documentary about the Maine windjammer fleet and featurion narration by long time schooner captain Jim Sharp.
Available on DVD Jan. 20, 2015 at www.shootmainestudios.com

Wednesday, June 18, 2014

"Hauling The HMS Bounty" The Maine Windjammer Project


"Hauling The HMS Bounty" by Doug Mills
Hauling the HMS Bounty for the last time at Boothbay Harbor Shipyard. [07-17-2012]



Tuesday, June 17, 2014

Unabridged Tall Ship Bounty Sinking Conclusions



INVESTIGATION INTO THE CIRCUMSTANCES
SURROUNDING THE SINKING OF THE TALL SHIP BOUNTY
123 MILES OFF THE COAST OF CAPE HATTERAS, NORTH CAROLINA ON OCTOBER 29, 2012 WITH LOSS OF ONE LIFE AND

ANOTHER MISSING AND PRESUMED DEAD

Conclusions

1. In accordance with reference (d) the Initiating Event (or first unwanted outcome) for this casualty was flooding. BOUNTY began to flood uncontrollably the moment the rate of water ingress exceeded the rate the bilge pumps could dewater. It has been concluded that this occurred on October 27th, when Capt. went to engage the hydraulic bilge pumps, which were seen as “emergency pumps.”

2. The causal factors that led to this casualty are as follows:

a) Environment:
 There were four primary environmental causal factors.

1) The weather was clearly a factor from the beginning of the voyage. Although the
conditions related to Hurricane Sandy didn’t directly affect the vessel until Saturday, October 27th, the crew was stowing gear and preparing the vessel for heavy weather from the time they departed New London, CT. Once the conditions began to worsen, increasing seas accelerated the rate that BOUNTY was making water. The increasing winds blew out multiple sails and caused the spanker gaff to break.

2) The impact of the environmental conditions was also detrimental to the crew. The increasing sea state caused many of the crew members to become seasick. The
conditions also made it difficult to get adequate sleep, not only because of the rough seas, but because the crew sleeping quarters became saturated with water that leaked through the deck. As the voyage progressed and conditions worsened, moving about the vessel became increasingly difficult and 3 crew members were injured as a result of falls, including Capt. .

3) As the vessel foundered and the decision was made to abandon ship, the
environmental conditions impacted the crew’s ability to communicate with the US
Coast Guard, any other nearby vessels, as well as each other on deck. Environmental conditions also made preparations to abandon ship, including donning survival suits as well as lifejackets and climbing harnesses, extremely difficult.

4) Once the crew had abandoned ship, the heavy weather conditions made it exceedingly difficult to get into the inflatable life rafts. Crew members testified that entering the life raft took at least one hour once they reached the raft. Wind and seas caused one of the life rafts to flip during the rescue.
b) Personnel: There are eight primary causal factors that involve human error on the part of the company owner and vessel master.

1) The inability and failure of HMS BOUNTY Organization to provide effective
oversight and operating restrictions for their vessel and personnel. Both
and were responsible for and made critical decisions regarding
the maintenance and operation of BOUNTY. They were ill equipped to make such
decisions due to their lack of experience with vessel operations, especially with
respect to an aged wooden vessel. They each had full knowledge that Capt.
intended to take BOUNTY into close proximity to Hurricane Sandy, and
took no action to stop or question his decision making. This constitutes negligence.

2) The failure of HMS BOUNTY Organization and Capt. to effectively
evaluate and determine if prevailing and forecasted weather conditions were
favorable for sailing. This constitutes negligence.

3) The failure of HMS BOUNTY Organization and Capt. to appropriately
evaluate the vessels material condition and suitability for sailing in the forecasted
weather conditions (given what they both knew about the condition of the vessel’s
structure and the lack of testing to ensure all bilge systems were fully functional and up to the task of performing to designed parameters). This constitutes negligence.

Wednesday, February 12, 2014

Captain's decision caused the tall ship Bounty to sink off Atlantic coast

A captain's "reckless decision to sail into the well-forecasted path of Hurricane Sandy" was the probable cause of the sinking of a ship off the North Carolina coast in October 2012, the National Transportation Safety Board said in a report released today. The captain and one crewmember died in the accident. Three other crewmembers were seriously injured.

The BountyOn the evening of October 25, 2012, a day after a closely watched developing storm had reached hurricane strength, the 108-foot-long tall wooden ship, the Bounty, set sail from New London, Conn., for St. Petersburg, Fla., into the forecasted path of Superstorm Sandy. The 52-year-old vessel, a replica of the original 18th Century British Admiralty ship of the same name, was built for MGM Studios for the 1962 movie, "Mutiny on the Bounty."

Prior to setting off from New London, some of the crewmembers had expressed their concerns to the captain that sailing into a severe storm could put all of them and the ship at risk. The captain assured the crew that the Bounty could handle the rough seas and that the voyage would be a success. Just a month earlier, in an interview with a Maine TV station, the captain said that the Bounty "chased hurricanes," and by getting close to the eye of the storm, sailors could use hurricane winds to their advantage.

The 16-page report details how a mostly inexperienced crew - some injured from falls, others seasick and fatigued from the constant thrashing of 30-foot seas - struggled for many hours to keep the ships engines running and bilge pumps operating so the seawater filling the vessel would not overtake it.

In the early morning hours of October 29, 2012, about 110 miles southeast of Cape Hatteras, N.C., the Bounty heeled sharply to the starboard side after taking on more than 10 feet of water in the final hours of a three and a half day voyage that the NTSB said, "should never have been attempted."

The Bounty, sinkingDespite hurricane winds gusting upwards of 100 mph, the U.S. Coast Guard was able to rescue all but two of the Bounty's 16 crewmembers by hoisting them from the sea into three Jayhawk helicopters in the midst of the storm. The body of one crewmember was found, still in a protective immersion suit, about 10 hours after rescue operations had commenced. The captain was presumed lost at sea; his body was never recovered.

"Although this wooden ship was modeled after an 18th century vessel, the Captain had access to 21st century hurricane modeling tools that predicted the path and severity of Hurricane Sandy," said NTSB Chairman Deborah A.P. Hersman. "The Bounty's crew was put into an extraordinarily hazardous situation through decisions that by any measure didn't prioritize safety."

Prior to setting to sea, the Bounty had been in a Maine shipyard for maintenance and repairs, most of which was accomplished by a crew with little experience in such specialized work. One of their tasks was to caulk and reseam a wooden hull, which had known areas of rot, with compounds supplied by the captain, including a silicone sealant marketed for household use.

The entity that owned and operated the ship, HMS Bounty Organization, LLC, did nothing to dissuade the captain from sailing into known severe weather conditions. The NTSB said that such a lack of effective safety oversight by the vessel organization contributed to the sinking.

The entire report is available at www.ntsb.gov/investigations/fulltext/MAB1403.html

Sunday, December 29, 2013

BEST OF 2013: HMS Bounty Hearings “Angels On The Wings Of The Storm”

HMS Bounty relaunched at Boothbay Harbor Shipyard in Maine just 10 days before she went down.

 HMS Bounty Hearings “Angels On The Wings Of The Storm”
Doug Mills
Maritime Editor
RCN America Network
Feb.21, 2013

The first witness of the day was Drew Salapatek  Bounty Deckhand

HMS Bounty
The morning was spent with the same routine with Mr Salapatek giving a running description of the last four days.  Nothing new was brought out in this session.

Chief Mate John Svendsen who has been with the bounty since 2008.

Mr Svendsen testified that he had voiced his concerns about sailing south to Captain Walbridge.  He had suggested alternate ports that were available to then rather than risk lives and the boat in the teeth of a hurricane.  Captain Walbridge was not open to any other options, stating that the boat was in the best shape it had been in and the storm was only a cat 1.  He was not open to any other plans.
Immediately after this conversation he held the meeting with the full crew where he stated there was a storm to the south but they were going to sail anyway.  He gave anyone who wanted to leave if they wished, however, there was no time to think it through as immediately after the meeting they started preparing to get under way.  They were at sea within ½ hour.
HMS Bounty at Boothbay Harbor, Maine
There was one other fact that came to light today.  In 1997 the Bounty sailed from the Boothbay Shipyard in Maine, headed south, into the teeth of “The Perfect Storm”!  They had to heave too for three days and lost one of the masts in the storm.

The next witness was Commander Mitchell USCG Sector North Carolina, Response Department Head.  Commander Mitchell was in charge if the rescue effort that saved 14 members of the Bounty crew.
It was Sunday Oct. 28 at 8:45 they received the first call from the Bounty, stating that they were taking on water.  This message had come in via satellite email.  It was assessed to be a medium risk to the Bounty.  The Coast Guard immediately tried to locate any other resources in the area military or civilian, none were close.
Due to a lack of ability to establish reliable communications and the severity of the storm the Coast Guard made the decision to launch a C130 to the area to establish reliable communications.  Conditions were at the high end of the aircraft's operating abilities due the high winds.  Once communications were established with the Bounty’s crew it was determined that delivering pumps in those conditions would not be possible.  By this time the ship was taking on water at a rate of two feet per hour!  The crew stated that they should be able to hold out till first light.  Plans were made to attempt a rescue at first light when conditions were predicted to be much better and daylight would aid in the search and rescue.
Captain Robin Walbridge Master of the HMS Bounty
At 4:26 AM the C130 reported that the Bounty had capsized and the crew was in the water.  A second C130 and two helicopters were launched in spite of the fact that the conditions were nearly above their safe operation levels.  In spite of the risk these brave crews launched into the night into the teeth of a hurricane.  When the first helicopter arrived 45 minutes later the seas were 20 feet and the wind was gusting over 90 mph!
The rest is history, they were able to save 14 crew members.  They found Ms Christian some 8.2 miles from the Bounty. She was unresponsive.  Captain Robin Walbridge was never found.

The hearings concluded around 3:30.  The conclusions will be published at a later date.










BEST OF 2013: HMS Bounty Hearings: Into The Eye Of the Storm

HMS Bounty Hearings: Into The Eye Of the Storm
Doug Mills
Maritime Editor
RCN America Network
Feb. 20, 2013


Today was a very busy day at the HMS Bounty hearings.  We heard from two Bounty hands and three captains of other tall ships.
First up today was Anna Sprague Deckhand on the bounty.  Much of her testimony was the same as we have been hearing.  She spoke of how long it took to get the first person into the life raft.  It took nearly an hour to get 6 people into the raft.  Anna stated that at one point she could hear a cry for help “Help me I’m caught”  But they were too farr away to get to.
There was continued questioning astute bilge pump systems and how there were concerns about the pumps before the ship set out for Florida.
We also heard from Jessica Black the cook on the Bounty.  She joined the crew the day before they sailed.

The rest of the day was given over to three highly experienced tall ship captains. The first was Captain Moreland from the Picton Castle.  Captain Moreland has over 40 years of experience most of that time in wooden sailing ships.  Master of the Picton Castle for the last 10 years.
On October 19th they were scheduled to sail south from Lunenburg, Nova Scotia but due to the weather forecast for the next days they postponed their departure.  As the storm developed the decision was made to prepare for heavy weather at the dock in Lunenburg.
When asked his reaction to finding out that Captain Walbridge had taken the HMS Bounty into the hurricane, Captain Moreland said that if he had found out sooner he would have personally called  him and even yelled at him for making such a decision.
He stated he could not imagine heading out into that storm, he could not believe it, it was shocking.

Next to testify was Captain Miles of the Pride Of Baltimore II.  Questions about caulking and the need to have it done by experienced caulkers.  Both Captains were asked about the products used to seal the seams after the caulking had been done.  Both Captains stated that they would never consider using a product like Dap, as the Bounty had used.
When asked “ What was your reaction to the Bounty sailing into the teeth of a hurricane, Captain Miles stated that he could not understand, “I was rather stunned!”  They should have stayed in port or possible moved to New Bedford which was better protected.  He stated he could not understand a reason to sail into that kind of weather.  Mariners should avoid as best they can a hurricane.   “It was reckless in the extreme!”

The last witness of the day was Captain Bailey of the Gazela Primeiro and the replica of the HMS Rose which appeared in the movie Master and Commander. When asked about Captain Walbridges decision to sail he stated he could not understand what would cause him to do such a thing.


BEST OF 2013: HMS Bounty Hearings Continue: Nightmare at Sea

Bounty Hearings: Nightmare at Sea
Doug Mills
Maritime Editor
RCN America Network

Scheduled to tesitfy on Feb. 18:

Matthew Sanders - Second mate of Bounty
Christopher Barksdale - Engineer of Bounty
Douglas Faunt - Deckhand/radio officer of Bounty

Matthew Sanders
A lot of time was spent questioning about the pumps and generators in great detail.  Matt Sanders the Second Mate spent Sunday night in the engine room keeping the pumps going.  During that last night the generator kept cutting out.  He struggled , replacing fuel filters and just trying to keep the generator and the pumps working through the as the water continued to rise.  The water finally reached the starboard generator and shorted it out.  Working in now waist deep water he attempted start the port generator.  After 1-2 hours, it was hard to keep track of time under those conditions, of changing fuel filters and bleeding the system he was able to get it running and restore power for the pumps and the radio.  It ran for about 3 hours before it to was overcome by the ever rising water.
Douglas Faunt
At this time the engine room had to be abandoned due to the height of the water and the shorting electrical equipment!  Preparations were being made to abandon ship.
All hands were brought up on deck and as they were moving to a position on the stern the bow went under and the Bounty was struck by a wave that rolled her onto her side.  In a nightmare of debris, rigging, wind and waves all hands were thrown overboard.  This was the last time that Captain Robin was seen being thrown back and forth on the deck.
Matt found himself in the water being forced under several times by the masts and rigging.  He was able to swim free away from the dangers of the pitching boat.  He spotted an life raft and managed to swim to it.  Still not safe as he could not get himself into the raft!  Some other crew members were able to enter from the other side and eventually did pull him in.  Than they waited for the morning.

Christopher Barksdale
Testimony from Bounty’s engineer, Christopher Barksdale stated that he had ordered replacement fuel filters when they left Boothbay to be delivered in New London.  When they were delivered they delivered the wrong filters.  It is not known if this affected the operation of the boat.  They did have a lot of problems with fuel filters during the height of the storm.

We may never know what caused that tragedy.
Captain Robin Walbridge overseeing Bounty's relaunch just 10 days before she went down.

One thing that seems abundantly clear was that this was an exceptional professional crew.



BEST OF 2013: HMS Bounty Hearing: The Last Hours of The Bounty


In hearings today Daniel Cleveland - Third mate of the Bounty testified, as did Laura Groves - Boatswain of Bounty
Much of the questioning was about the condition of the boat.  When the Bounty was in dry dock in Boothbay, Maine there was rot found in some of the frame of the boat.  After the dry dock period a watch for any leaks showed the bilge area to be exceptionally dry.  There were questions about ships procedures and emergency drills which the Bounty held on a very regular basis.  When questioned about the decision to sail south rather than ride it out at the dock Daniel Cleveland stated he did not thing that the crew would be safer at the dock as the storm surge was great enough to have put the boat onto the dock.

The Last Hours of the HMS Bounty

Thursday 25th…Bounty sails from New London, Ct. after determining ,as with most large vessels, it is better to weather a storm at sea.  The plan was to run hard South and East and try to cut back in toward the west once there was no chance of the storm also turning west and driving them into the land.
Things were calm the weather was actually quite nice.  Time was spent battening down anything that could break loose when  they did get into some heavy seas.

Friday 26th…Started off calm.  Continued storm preparations.

Saturday 27th … The seas start running 8-12 feet and the wind starts to increase.  One of the two onboard generators starts to give problems, smoking and occasionally loosing power.

Sunday 28th …The storm continues to intensify.  Lifelines are rigged both below deck and on deck.  There have been no injuries however there has been some seasickness.  Fatigue becomes an issue as the day wares on.
Early on the seas reach 30’ with winds of 90 knots.  The storm sail ripped out and had to be replaced be another storm sail, however, it was impossible to walk on deck due to the wind.  The work had to be accomplished on their hands and knees.
Water starts coming in through a seem in the engine room.  The bilge pumps are having a hard tome keeping up.
Around 1600 Captain Robin Walbridge ordered them to heave too due to the fact that they are loosing the battle with the water coming into the bilges of the boat.  From this point on crew was kept off the deck as much as possible for their safety.  Water was continuing to come into the engine room.
At midnight they completely lost power for a short time.  Crew tried to use an emergency gas powered pump but were unable to keep it running.  The water continued to rise and the crew had to abandon the engine room,.  The crew continued preparations for the possibility they would have to abandon ship.  Emergency supplies flotation deveses and survival suits were prepared.
At some point Captain Robin Walbridge fell and injured his back.  During this tome Captain Robin and other crew were on the radio and phones to the Coast Guard to try to get generators delivered and to report their condition to rescuers and to the boat owners.  It soon became apparent that the generators could not be delivered in time to save the ship it was time to give as much of the crew time to rest with a few continuing to work the gas powered pump but to no avail.
Abandon ship… with survival suits on the crew is brought on deck and mad their way to the stern on their hands and knees where the life rafts were located.  At this point the bow went under water and the ship pitched over 90 degrees throwing the crew into the sea.  The crew grabbed whatever they could and tried to swim away from the boat.  The ship continued to pitch over sending the masts and spars into the waters where the crew were desperately trying to swim away from the ship.  Six of the crew grabbed a large grate.  One of the life rafts was spotted but the were unable to catch up to it.  They did eventually find a life raft that had not been inflated and were able to inflate it.  With their survival suits on they were unable to grab the ropes and had to grab onto the raft with their teeth.  After a while they were able to get the crew into the raft.  All this in the dark around 4AM.
Once in the raft they were in good spirits but not out of the woods.  The waves were so strong that they were threatening to collapse the life raft.  Something before dawn a large wave totally flipped the raft.  Fortunately the Coast Guard Rescue Helicopter arrived and they all got back into the water and were lifted to safety.
The last time that Captain Robin and  Claudene Christian were seen was on deck before the ship pitched over.